How to Install Metal Display Tower
 Oct 14, 2020|View:713

1. The metal display tower packaging is generally made of wood packing box, internal brand packaging, waterproof treatment, etc., so as to avoid the deformation of the shelf structure in the process of transportation, affect the installation and use, and prevent rainy weather, spray plastic on the surface of the shelf.

2. The installation sequence of metal display tower is generally as follows: first install the mainframe (two columns, install the connecting rod, install the backplate or back net, install the upper connecting rod, install the front baffle, and install the bottom plate); after connecting the sub-rack (the installation sequence of one column, upper and lower connecting rod, backplate back net installation is the same as the mainframe), after the metal display tower structure is established, the installation is simple, and finally, the upper plate is hung Corbel, install laminate. Finally, the price tag is clamped into the laminate to finish the installation.

metal display tower

3. After the purchased shelves arrive at the store, they shall be checked according to the delivery list. First, they shall be used as proof of receipt. Second, in case of missing parts from manufacturers, they can contact to deliver goods in time, so as to prevent delay of metal display tower installation time and impact on business opening.

4. Open the package one by one according to the name of the parts on the package. If there are not many installers, it is recommended not to open them all at once. The order of unpacking is a column, upper and lower connecting rod, hole backplate or back net, front baffle, metal display tower bottom plate, and finally laminate and support. This is the sequence of the metal display tower structure installation. The laminate and support are finally unpacked and installed because this process can be carried out together with the goods displayed on the storefront because the height interval of the laminates is determined by the goods, so the secondary installation and adjustment can be avoided.

CopyRight © 2013-2024   Jiangsu All Molding New Material Co., Ltd  All rights reserved    Sitemap  All tags   Designed by Zhonghuan Internet